Project Manager

  1. Contract
198421
  1. France
  2. Hydro Power
Market related
Date posted09/06/2021

Situation:

The Isimba hydropower project is located on the Nile River, approximately 50km downstream of Jinja, Uganda.
The project includes a concrete gravity dam on the left bank, a rock-fill embankment dam on the right bank, a spillway, a powerhouse, switching yard, and power transmission lines. The concrete dam provides a reservoir retaining structure in front of the erection bay, while the rock-fill dam features emergency gates and stop logs.
The Isimba powerhouse features four 48.5MW vertical Kaplan turbine and generator units. The concrete gravity dam is 14m-tall and 314m-long, while the embankment dam has a maximum height of 26.5m. The Isimba hydroelectric plant is designed to operate at a gross head of 15.4m and an average flow rate 1,375m³/s of water.
The switchyard of the project comprises a double busbar substation with two-line bays, four transformer bays, one bus coupler, and two future bays.

China International Water & Electric Corporation (CWE) was awarded the engineering, procurement, and construction (EPC) contract.

 

Requirement - E&M Resident Project Manager 

  • 20 years industry experience 
  • E&M background and Degree
  • Extensive Hydropower experience 
  • Client facing experience 
  • Track record of seeing projects through to finish 

  • Starting ASAP for 12 months 
  • Budget monthly 12,000 to 14,000 USD - I would suggest considering 17,000 USD
  • 2.5 monthly rotation
  • Full expat package provide

Situation:

The Isimba hydropower project is located on the Nile River, approximately 50km downstream of Jinja, Uganda.
The project includes a concrete gravity dam on the left bank, a rock-fill embankment dam on the right bank, a spillway, a powerhouse, switching yard, and power transmission lines. The concrete dam provides a reservoir retaining structure in front of the erection bay, while the rock-fill dam features emergency gates and stop logs.
The Isimba powerhouse features four 48.5MW vertical Kaplan turbine and generator units. The concrete gravity dam is 14m-tall and 314m-long, while the embankment dam has a maximum height of 26.5m. The Isimba hydroelectric plant is designed to operate at a gross head of 15.4m and an average flow rate 1,375m³/s of water.
The switchyard of the project comprises a double busbar substation with two-line bays, four transformer bays, one bus coupler, and two future bays.

China International Water & Electric Corporation (CWE) was awarded the engineering, procurement, and construction (EPC) contract.

 

Requirement - E&M Resident Project Manager 

  • 20 years industry experience 
  • E&M background and Degree
  • Extensive Hydropower experience 
  • Client facing experience 
  • Track record of seeing projects through to finish 

  • Starting ASAP for 12 months 
  • Budget monthly 12,000 to 14,000 USD - I would suggest considering 17,000 USD
  • 2.5 monthly rotation
  • Full expat package provide

Related jobs

Salary

Market related

Options: Contract
Location

Paris

Description

Good afternoon, I am urgently seeking a Claims Manager for the Mechanical scope of a large Hydropower Plant in Ethiopia.This will be a long term contract opportunity based onsite.See details below:Rol